{"id":2697,"date":"2025-09-17T11:03:56","date_gmt":"2025-09-17T11:03:56","guid":{"rendered":"https:\/\/latamlogistics.es\/?p=2697"},"modified":"2025-10-28T09:42:19","modified_gmt":"2025-10-28T09:42:19","slug":"revision-del-diseno-detallado-para-la-renovacion-de-rwy-y-twy-para-el-aeropuerto-de-lima","status":"publish","type":"post","link":"https:\/\/latamlogistics.es\/en\/revision-del-diseno-detallado-para-la-renovacion-de-rwy-y-twy-para-el-aeropuerto-de-lima\/","title":{"rendered":"Detailed design review for RWY and TWY renovation for Lima Airport"},"content":{"rendered":"<p>LATAM LOGISTICS was contracted to review the Airfield Ground Lighting section of the construction project for the renovation of the existing runway visual aids system at Lima - Jorge Chavez International Airport.<\/p>\n<p>Consulting services:<\/p>\n<ul>\n<li>Review of the documentation provided to ensure that the project for the renovation of the visual aid systems is in strict compliance with both national and international regulations.<\/li>\n<li>Review of the plans provided to ensure that the layout of visual aids complies with national and international standards.<\/li>\n<li>Review of the List of Quantities to ensure that the measurements taken agree with the drawings submitted.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>LATAM LOGISTICS fue contratada para revisar la secci\u00f3n de Iluminaci\u00f3n Terrestre de Aer\u00f3dromo del proyecto de construcci\u00f3n para la renovaci\u00f3n del sistema de ayudas visuales de la pista existente en el Aeropuerto Internacional de Lima &#8211; Jorge Ch\u00e1vez. Servicios de consultor\u00eda: Revisi\u00f3n de la documentaci\u00f3n aportada para garantizar que el proyecto de renovaci\u00f3n de los&hellip;&nbsp;<a href=\"https:\/\/latamlogistics.es\/en\/revision-del-diseno-detallado-para-la-renovacion-de-rwy-y-twy-para-el-aeropuerto-de-lima\/\" rel=\"bookmark\">Read More &raquo;<span class=\"screen-reader-text\">Detailed design review for RWY and TWY renovation for Lima Airport<\/span><\/a><\/p>","protected":false},"author":2,"featured_media":1641,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"off","neve_meta_content_width":70,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"on","footnotes":""},"categories":[11],"tags":[22],"class_list":["post-2697","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyecto","tag-campo-de-vuelo"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/posts\/2697","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/comments?post=2697"}],"version-history":[{"count":2,"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/posts\/2697\/revisions"}],"predecessor-version":[{"id":2824,"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/posts\/2697\/revisions\/2824"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/media\/1641"}],"wp:attachment":[{"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/media?parent=2697"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/categories?post=2697"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/latamlogistics.es\/en\/wp-json\/wp\/v2\/tags?post=2697"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}