GAPTEK contracted LATAM LOGISTICS for the preparation of the Airport General Master Plan, globally integrating the airside, landside, and cargo areas. The project defines the strategic development of the infrastructure through an iterative design structured in short- and long-term phases.
Services provided:
Strategic planning: Development of the Master Plan in two phases (short and long term) for the efficient integration of all facilities.
Integral design: Preparation of phased development drawings for the airside, landside, and cargo areas, optimizing the layout and relocating strategic buildings.
Documentation and close-out: Preparation of executive presentations and delivery of the final documentation approved by the client.